• Town mulls over water problems
    May 02,2014
    • Email Article
    •  
    •  Print Article
     
    Town mulls over

    water problems

    ST. JOHNSBURY ó The town of St. Johnsbury has its share of water woes.

    Officials said water and sewer users are facing more than $6 million in maintenance needs at the water filter and sewer treatment plants. And more than $1.5 million is needed to fix pipe problems at a water main.

    Engineer Red Dufresne told the Caledonian Record that the townís three filtration tanks at the Stiles Pond filter plant are made of painted steel, which is rusting into the water supply. Thatís a $2 million replacement. Itís not clear how much longer the tanks will last.

    Another problem is the Moose River water main, a primary water line thatís submerged, unsupported, in a river. Dufresne hopes it can be repaired before it ruptures.

    Select Board members are discussing the problems.
    • Email Article
    •  
    •  Print Article
    2 Comments
    MORE IN This Just In
    LUDLOW ó Arlington got 11 points from Riley lane and 10 from Maggie Murphy in cruising to the win... Full Story
    Shop awards gift of knit Welsh flag Full Story
    Vermont Technical College recently announced a new initiative to set new annual enrollment growth... Full Story
    More Articles